Construction Japanese
Workplace Dialogues: Construction Japanese
Explore 15 real workplace Japanese conversation dialogues in Construction Japanese. Practice Japanese workplace communication with GoMe Nihongo.
Meetings & Reporting
-
Site Morning Assembly and Hazard Prediction (KY)
朝礼とKY活動を進めるStart of the site day, pouring concrete for 2nd-floor slab. As general contractor field engineer, leading morning assembly and conducting KY session with subcontractor foreman: hazards, countermeasures, and action targets.
13 lines -
Pre-Lift Tool Box Meeting (TBM) and Safety Briefing Before Crane Operations
クレーン作業の前にTBMをするThis morning, the crane hoists rebar bundles onto the fifth-floor deck. Before operations commence, you lead a Tool Box Meeting (TBM) with Yamamoto, the subcontractor rigging foreman: assigning slinging and signaling duties, demarcating the exclusion zone, and agreeing on suspension criteria.
13 lines -
Reporting Construction Progress at the Weekly Meeting with the Owner
定例会議で工程を報告するAt the regular weekly coordination meeting with the project owner and design supervisor, you present structural framing and interior finishing progress updates. You urge the client to finalize exterior tile color selections promptly, as exterior facade works lie directly on the project critical path.
13 lines -
Conducting New Worker Safety Orientation and Site Induction
新規入場者教育をするA subcontractor worker enters the site for the first time. Before work begins, you conduct new worker orientation: filling out the form, checking certifications, required PPE, restricted areas, smoking area, evacuation route, and health.
13 lines
Bugs & Incidents
-
Reporting a Schedule Delay to the Project Owner
発注者に工程の遅れを報告するProlonged rainfall and delayed rebar shipments have set back the fourth-floor slab concrete placement by one week. As the general contractor site engineer, you report to the owner's project representative: the extent of the delay, its impact on the final completion date, the proposed schedule recovery plan, and cost considerations.
12 lines -
Notifying the Trade Foreman of a Ready-Mix Concrete Truck Delay
生コンの遅れを職長に伝えるWhile executing a concrete slab pour during sweltering summer heat, the batching plant telephones to report that the next transit mixer truck is trapped in traffic following a traffic accident. You alert the concrete placing foreman, formulate measures to prevent cold joints, and instruct him to record stand-down idle time.
12 lines -
Receiving and Resolving a Noise Complaint from a Neighboring Resident
近隣住民から騒音の苦情を受けるAn elderly neighbor living next door comes to the site gate to complain about concrete chipping noise and dust. You apologize, clarify how long the work will continue, offer measures to reduce noise and dust, and provide a direct contact person.
13 lines -
Reporting a Near-Miss Incident (Hiyari-Hatto) to the Project Director
ヒヤリハットを所長に報告するA scaffold pipe clamp fell from the 4th floor scaffolding to the walkway below, fortunately not hitting anyone. You report immediately to the project director: what happened, the cause, and measures implemented starting today.
14 lines
Specs & Requirements
-
Confirming Sleeve Penetrations with the MEP Subcontractor
打設前にスリーブを設備業者と確認するA few days prior to the concrete slab pour, you and the MEP subcontractor lead cross-check pipe sleeve penetrations through beams, discovering a discrepancy between the construction shop drawings and the latest MEP drawings.
12 lines -
Coordinating Ceiling Plenum Clashes with the MEP Subcontractor
天井内の取り合いを設備業者と調整するThe composite coordination drawing reveals that the duct and the drainage pipe clash within the 4th floor corridor ceiling void, directly beneath the beam. You meet with the MEP contractor engineer to reroute the conduits, establish scope demarcations, and set drawing delivery dates.
10 lines -
Consulting the Site Agent Regarding a Proposed Design Change
設計変更を現場代理人に相談するThe architectural design supervisor telephones to convey the client's desire to add an extra door in the fifth-floor conference room partition wall, right as drywall gypsum boarding has already commenced. You consult the project director (shochō, also acting as site agent / genba dairinin) regarding formal directive receipt, cost variation estimating, and schedule implications.
13 lines -
Confirming Concrete Pump Truck Arrival Time by Telephone
ポンプ車の時間を電話で確認するOn the afternoon prior to the second-floor slab concrete placement, you telephone the concrete pumping company: verifying truck arrival time, setup position, boom reach coverage, outrigger soil bearing capacity, and rain cancellation notice protocols.
13 lines
Review & QA
-
Conducting a Rebar Arrangement Inspection with the Design Supervisor
監理者と配筋検査をするOne day prior to the fifth-floor slab and beam concrete pour, you accompany the architectural design office supervisor on a formal rebar inspection. All internal quality audit punch list defects have been rectified, but the supervisor identifies an area where concrete cover depth appears deficient.
12 lines -
Identifying Floor Slab Surface Unevenness During Inspection
検査で床の不陸を見つけるDuring an in-house quality inspection conducted prior to interior trade mobilization, you measure 4th floor concrete elevations with an optical level and discover an area surrounding a structural column sunken beyond allowable tolerances. You coordinate with the plastering trade foreman on rectification methods, material approval, and completion deadlines.
12 lines -
Reviewing Completed Work with the Subcontractor at Month-End
月末に協力会社の出来高を査定するBefore the cutoff date, the formwork subcontractor representative brings the records of work completed this month. You cross-check them against the quantities verified on site, determine the approved percentage, and handle unsigned daywork slips.
12 lines