Construction Japanese · 生コンの遅れを職長に伝える

Notifying the Trade Foreman of a Ready-Mix Concrete Truck Delay

While executing a concrete slab pour during sweltering summer heat, the batching plant telephones to report that the next transit mixer truck is trapped in traffic following a traffic accident. You alert the concrete placing foreman, formulate measures to prevent cold joints, and instruct him to record stand-down idle time.

Me

Kimura-san, excuse me. I just received a telephone call from the ready-mix batch plant; they said the next transit truck will be delayed.

Other (T)

What? By approximately how long?

Me

There was an accident on the national road, so they say it could be delayed by nearly 1 hour.

Other (T)

1 hour? Because it is hot today, the area we are currently placing will begin to stiffen and set.

Me

Yes, I am deeply concerned that it will turn into a cold joint.

Me

I am inquiring with the plant right now to see whether they can dispatch a truck via an alternative route.

Other (T)

When the next truck arrives, should we place the new concrete over the layer immediately?

Me

Yes. When doing so, please ensure the poker vibrator is inserted thoroughly deep into the underlying layer.

Other (T)

Understood. If it does not make it in time, what will we do?

Me

In that scenario, I will consult with the design supervisor to determine the construction joint location.

Other (T)

Understood. I will have the crew rest for a little while.

Me

Please do. Please make sure to record the stand-down waiting time in the daily work log.

Key Patterns

  • Relaying critical news just received via telephone call
  • Expressing serious technical apprehension regarding an emerging site risk
  • Reporting that one is currently inquiring about alternative mitigation options
  • Directing a supervisor to log specific details into formal work logs

Source

Authored by GoMe