建設 · Tokutei Ginou

Tokutei Japanese Vocabulary: Construction

Construction site safety, tools, building materials, and site execution.

Lessons & Vocabulary

Unit 1: Occupational Safety, Personal Protective Equipment, and Scaffolding Work

Personal protective equipment for fall prevention and safety rules for working on high-elevation scaffolding.

Personal Protective Equipment and Fall Prevention

Vocabulary for: Personal Protective Equipment and Fall Prevention
Vocabulary (Kanji / Kana) Reading Meaning & Notes
ヘルメット へるめっと safety helmet, hard hat
Always wear a safety helmet on the construction site.
あご紐 あごひも chin strap
Fasten the chin strap securely while working.
墜落制止用器具 ついらくせいしようきぐ fall arrest equipment, fall prevention harness

The current statutory designation includes full-body harnesses and waist belt types, replacing the term 安全帯.

Use fall arrest equipment when performing elevated work.
安全帯 あんぜんたい safety belt

Former term; the current legal designation under safety regulations is 墜落制止用器具.

Attach the safety belt hook to the lifeline.
ランヤード らんやーど lanyard, energy-absorbing connecting lanyard
Inspect the lanyard for cuts, damage, and wear.
安全靴 あんぜんぐつ safety shoes, steel-toe boots
Safety shoes protect your feet even if you step on a nail.
防塵マスク ぼうじんますく dust mask, particulate respirator
Wear a dust mask in locations where dust is swirling in the air.
保護メガネ ほごめがね safety glasses, protective goggles
Wear safety glasses when performing concrete chipping work.
掘削 くっさく excavation, digging
Place excavated soil away from the edge of the pit.
皮手袋 かわてぶくろ leather work gloves
Use leather gloves when carrying rebar.

Scaffolding and Safe High-Elevation Work Rules

Vocabulary for: Scaffolding and Safe High-Elevation Work Rules
Vocabulary (Kanji / Kana) Reading Meaning & Notes
足場 あしば scaffolding
Inspect the scaffolding before starting work.
作業床 さぎょうゆか working platform, scaffold deck
Check that there are no gaps in the working platform.
手すり てすり handrail, safety guardrail
Handrails are installed at the edges of the scaffolding.
中桟 なかざん mid-rail, intermediate rail
The mid-rail prevents workers from falling through.
幅木 はばき toe-board, kickplate
Install toe-boards to prevent tools from dropping.
筋交い すじかい diagonal brace, cross brace
Prevent the scaffolding from shaking by using diagonal braces.
脚立 きゃたつ stepladder, A-frame ladder
Do not stand on the top step of a stepladder.
昇降階段 しょうこうかいだん access stairway, temporary construction stairs
Climb up to the scaffolding safely using the access stairway.
親綱 おやづな lifeline, main safety rope
Securely hook the fall arrest equipment to the lifeline.
土止め支保工 つちどめしほこう earth retaining shoring, trench support
Assemble earth retaining shoring during deep excavations.

Unit 2: Tools, Construction Machinery, and Slinging Operations

Safety rules for hand tools, heavy construction equipment, and crane slinging (tamagake) procedures.

Hand Tools and Power Tools on Site

Vocabulary for: Hand Tools and Power Tools on Site
Vocabulary (Kanji / Kana) Reading Meaning & Notes
インパクトドライバー いんぱくとどらいばー impact driver, cordless impact driver
Drive screws into the wood using an impact driver.
丸のこ まるのこ circular saw, portable circular saw
Check whether the safety blade guard of the circular saw moves smoothly.
ディスクグラインダー でぃすくぐらいんだー angle grinder, disc grinder
Inspect the grinding wheel of the angle grinder.
配管 はいかん piping, pipe installation
Route the piping through the interior of the wall.
法面 のりめん slope, embankment slope (taluy)
Check the slope gradient so that the embankment does not collapse.
漏電遮断器 ろうでんしゃだんき earth leakage circuit breaker (ELCB)

Periodically test the breaker by pressing the test button (テストボタン).

Install an earth leakage circuit breaker on temporary power supplies.
水平器 すいへいき spirit level, level vial
Apply a spirit level to check the plumb and inclination of the column.
延長コード えんちょうこーど extension cord, extension lead
Check whether the insulation sheath of the extension cord has any tears.
発電機 はつでんき generator, portable power generator
Operate the generator outdoors in a well-ventilated area.
腰袋 こしぶくろ tool pouch, waist tool belt
Return used tools to your tool pouch immediately.

Construction Machinery and Crane Slinging (Tamagake) Procedures

Vocabulary for: Construction Machinery and Crane Slinging (Tamagake) Procedures
Vocabulary (Kanji / Kana) Reading Meaning & Notes
バックホウ ばっくほう backhoe, crawler excavator
Do not enter within the operating radius of the backhoe.
クレーン くれーん crane, mobile crane
Lift the structural steel members to high locations using a crane.
玉掛け たまがけ slinging, crane load rigging (tamagake)

Operators performing slinging work must hold a designated slinging qualification.

A qualified operator performs slinging work correctly.
ワイヤーロープ わいやーろーぷ wire rope, steel hoisting cable
Discard wire ropes that have broken strands.
電線管 でんせんかん conduit, electrical conduit tube
Route electrical wiring through the conduit.
吊り荷 つりに suspended load, hoisted load
Never step underneath a suspended load under any circumstances.
合図 あいず signal, hand signal, crane signaling
Operate the crane in accordance with instructions from the signalperson.
誘導員 ゆうどういん traffic controller, banksman, site signalperson
Station a traffic controller at the entrance and exit for heavy machinery.
定格荷重 ていかくかじゅう rated load, maximum working load
You cannot hoist loads that exceed the rated load capacity.
地切り じぎり initial lift, test lift (jigiri)

Pausing the lift at approximately 10 to 20 cm above the ground to confirm load stability and balance.

Stop the lift once at the initial lift height to verify that the load is stable.

Unit 3: Construction Drawings, Surveying, and Marking Layout

Reading construction blueprints, dimension symbols, and surveying layout marking techniques.

Construction Blueprints and Architectural Design Symbols

Vocabulary for: Construction Blueprints and Architectural Design Symbols
Vocabulary (Kanji / Kana) Reading Meaning & Notes
施工図 せこうず shop drawing, detailed working drawing
Review the shop drawings prepared by the site supervisor.
平面図 へいめんず floor plan, architectural plan
Look at the floor plan to confirm the layout of the rooms.
給水管 きゅうすいかん water supply pipe
Check whether water is leaking from the connections of the water supply pipe.
断面図 だんめんず cross-section drawing, sectional view
Examine the cross-section drawing to check the floor thickness for each story.
基準点 きじゅんてん reference benchmark, site datum point
Measure the building position starting from the site reference point.
寸法 すんぽう dimension, geometric measurement
Fabricate components strictly according to the dimensions indicated on the drawings.
通り芯 とおりしん grid line, column center line
Assemble the columns using the grid line as a reference.
ダクト だくと duct, ventilation duct
Install ventilation ducts inside the ceiling plenum.
排水管 はいすいかん drain pipe, drainage pipe
Slope the drain pipe in the direction of water flow.
設計変更 せっけいへんこう design change, revision
Use the new drawings because there was a design change.

Surveying Techniques, Measurement, and Axis Layout Marking

Vocabulary for: Surveying Techniques, Measurement, and Axis Layout Marking
Vocabulary (Kanji / Kana) Reading Meaning & Notes
墨出し すみだし layout marking, chalk lining (sumidashi)
Mark the layout positions of the columns onto the concrete floor.
墨つぼ すみつぼ chalk line box, ink marker line
Pull the ink line taut and snap it to mark the line.
レーザー墨出し器 れーざーすみだしき laser level, laser layout marker
Project vertical lines using a laser level.
下げ振り さげふり plumb bob
Suspend a plumb bob to check the vertical alignment of the wall.
レベル れべる optical level, builder's level instrument
Measure the floor elevation accurately using a level instrument.
標尺 ひょうしゃく leveling rod, grade rod, surveyor's staff
Hold the leveling rod vertically straight and read the measurement value.
陸墨 ろくずみ horizontal datum mark, level line (rokuzumi)
Snap a horizontal datum line on the wall to align elevations.
逃げ墨 にげずみ offset line, reference backup line (nigezumi)
Mark an offset line in advance so it will not be hidden by the columns.
直角 ちょっかく right angle, 90-degree square
Set a right angle using a carpenter's square.
勾配 こうばい slope, gradient, pitch
Provide a gradient on the floor so that water drains away smoothly.

Unit 4: Foundations, Rebar, Formwork, and Concrete

Structural construction processes: rebar arrangement, formwork erection, and concrete placing and curing.

Rebar Fabrication and Foundation Reinforcement Installation

Vocabulary for: Rebar Fabrication and Foundation Reinforcement Installation
Vocabulary (Kanji / Kana) Reading Meaning & Notes
配筋 はいきん rebar arrangement, rebar placing
Place the rebar correctly in accordance with the shop drawings.
異形鉄筋 いけいてっきん deformed rebar, deformed steel bar
Use deformed rebar to improve bonding with the concrete.
結束線 けっそくせん tie wire, rebar binding wire
Fasten the intersecting rebar joints using tie wire.
ハッカー はっかー pincer hook, rebar tying hook (hacker)
Twist the rebar tying hook swiftly to tighten the tie wire.
スペーサー すぺーさー rebar spacer, concrete cover block
Position spacers at appropriate intervals.
かぶり厚さ かぶりあつさ concrete cover thickness

Crucial for preventing reinforcement rebar corrosion and ensuring structural fire resistance.

Ensuring the specified concrete cover thickness is essential.
継手 つぎて rebar splice, rebar joint
Rebar splices include lap splices and gas-pressure welded splices.
定着長さ ていちゃくながさ anchorage length, development length
Provide sufficient anchorage length at the column-to-beam connection joints.
地盤 じばん ground foundation, subgrade
Check whether the ground can support the building weight.
埋設管 まいせつかん underground buried pipe
Confirm the locations of buried pipes before beginning excavation.

Concrete Formwork Assembly and Wall Tie Bracing

Vocabulary for: Concrete Formwork Assembly and Wall Tie Bracing
Vocabulary (Kanji / Kana) Reading Meaning & Notes
型枠 かたわく formwork, concrete shuttering
Assemble formwork into which concrete will be poured.
コンパネ こんぱね formwork plywood, film-faced plywood (konpane)
Cut formwork plywood to the specified dimensions.
サポート さぽーと pipe support, shore, steel shoring prop
Support the slab formwork securely with pipe supports.
セパレーター せぱれーたー form separator, wall thickness spacer
Insert form separators to keep the wall thickness uniform.
フォームタイ ふぉーむたい form tie, form clamping bolt
Tighten the formwork and waler pipes together using form ties.
単管パイプ たんかんぱいぷ single steel pipe, scaffolding tube waler
Place single steel pipes against the formwork to ensure straight alignment.
脱型 だっけい form stripping, formwork striking
Perform form stripping once the concrete has hardened to sufficient strength.
建て込み たてこみ formwork erection, assembling shuttering
Proceed with the formwork erection work for the walls.
剥離剤 はくりざい form release agent, mould oil
Apply a form release agent to the formwork to make stripping easier.
締め付け しめつけ tightening, clamping formwork hardware
Tighten the metal clamps so they can withstand the pressure of fresh concrete.

Ready-Mixed Concrete, Pouring Techniques, and Curing

Vocabulary for: Ready-Mixed Concrete, Pouring Techniques, and Curing
Vocabulary (Kanji / Kana) Reading Meaning & Notes
生コン なまこん ready-mixed concrete, fresh concrete
Ready-mixed concrete has arrived at the site in mixer trucks.
打設 だせつ concrete placing, concrete pouring
Perform slab concrete placing on a day with favorable weather.
コンクリートポンプ車 こんくりーとぽんぷしゃ concrete pump truck, boom pump
Deliver fresh concrete to upper floors using a concrete pump truck.
バイブレーター ばいぶれーたー concrete vibrator, immersion poker vibrator
Apply a concrete vibrator to consolidate fresh concrete without leaving voids.
スランプ すらんぷ slump, concrete slump test value

A standard test measuring the workability and consistency of fresh concrete.

Measure the slump value of ready-mixed concrete during the acceptance inspection.
ジャンカ じゃんか honeycomb defect, concrete void (janka)

Honeycomb voids on the concrete surface caused by insufficient consolidation or segregation of aggregate.

Honeycomb defects occur when concrete compaction is insufficient.
養生 ようじょう concrete curing, moisture curing
After pouring, spray water and cure the concrete thoroughly.
レイタンス れいたんす laitance, cement scum layer

A weak scum layer of cement laitance that must be removed from cold joints before pouring the next batch.

Remove laitance from cold joint surfaces using high-pressure water.
コテ仕上げ こてしあげ trowel finishing, steel float finishing
Perform trowel finishing to create a smooth surface using a steel trowel.
空気量 くうきりょう air content in fresh concrete

Target air content in fresh concrete is typically maintained around 4.5%.

Verify that the air content is within specified limits during the fresh concrete test.

Unit 5: Interior and Exterior Finishing, Demolition, and Handover Cleaning

Techniques for drywall installation, plastering and painting, flooring, and construction waste sorting.

Drywall Ceilings, Plastering, Painting, and Tiling

Vocabulary for: Drywall Ceilings, Plastering, Painting, and Tiling
Vocabulary (Kanji / Kana) Reading Meaning & Notes
石膏ボード せっこうぼーど gypsum plasterboard, drywall board
Affix gypsum board to the walls.
軽鉄 けいてつ light-gauge steel framing, stud wall frame
Assemble light-gauge steel framing substrates to construct walls.
アース あーす earth ground, grounding
Always connect the earth ground for electric power tools.
パテ処理 ぱてしょり joint compound puttying, taping and jointing
Fill the joints between boards smoothly with joint compound putty.
クロス貼り くろすはり wallpaper hanging, cloth covering installation
Hang the wallpaper neatly after preparing the underlying substrate.
塗装 とそう painting, architectural coating
Finish the exterior wall painting using a roller.
マスキングテープ ますきんぐてーぷ masking tape, painters tape
Apply masking tape so that paint does not splatter or bleed onto adjacent areas.
養生シート ようじょうしーと protective drop sheet, floor masking sheet
Lay down protective sheets so the floor is not scratched or damaged.
タイル貼り たいるはり tile installation, floor and wall tiling
Install slip-resistant floor tiles in the bathroom.
シーリング しーりんぐ joint sealant, caulking seal
Inject sealant around the window sashes.

Carpentry, Joinery, Waterproofing, and Self-Inspection

Vocabulary for: Carpentry, Joinery, Waterproofing, and Self-Inspection
Vocabulary (Kanji / Kana) Reading Meaning & Notes
建具 たてぐ joinery, architectural fittings, doors and windows
Install the door fittings and verify that they open and close smoothly.
フローリング ふろーりんぐ wood flooring, timber floor covering
Lay wood flooring with natural grain on the living room floor.
巾木 はばき baseboard, interior skirting board

Interior baseboard/skirting, distinct from scaffolding toe-boards (幅木).

Fasten baseboards to conceal the gap between the wall and the floor.
コーキング こーきんぐ caulking, silicone joint sealing
Apply caulking into gaps to prevent rainwater ingress.
断熱材 だんねつざい thermal insulation material
Pack fiberglass thermal insulation inside the walls without leaving gaps.
防水シート ぼうすいしーと waterproof membrane, breathable weather-resistive barrier
Overlap and apply waterproof sheets seamlessly over the exterior wall framing.
埋め戻し うめもどし backfilling, soil backfill
Fill soil over the piping and perform backfilling.
雨樋 あまどい rain gutter, roof downspout
Install rain gutters to drain rainwater coming off the roof.
足場解体 あしばかいたい scaffolding dismantling, scaffold striking
Begin dismantling the scaffolding now that exterior work is finished.
自主検査 じしゅけんさ self-inspection, voluntary quality check
Perform a self-inspection before final handover to confirm the quality of finish.

Demolition, Waste Sorting, and Handover Cleaning

Vocabulary for: Demolition, Waste Sorting, and Handover Cleaning
Vocabulary (Kanji / Kana) Reading Meaning & Notes
解体作業 かいたいさぎょう demolition work, structural teardown
Perform demolition work on old buildings with close attention to safety.
ガラ がら concrete rubble, crushed masonry debris
Load concrete rubble into the dump truck.
産廃 さんぱい industrial waste (sanpai)

Common industry abbreviation for 産業廃棄物 (industrial waste).

Properly dispose of industrial waste such as wood scrap and plastic.
分別収集 ぶんべつしゅうしゅう separate waste collection, sorting for recycling
Collect metals and timber separately to recycle them.
散水 さんすい water spraying, dust suppression wetting
Work while spraying water to prevent dust from flying into surrounding areas.
集塵機 しゅうじんき dust collector, industrial vacuum extractor
Use a dust collector during indoor work to vacuum up dust.
防音シート ぼうおんしーと acoustic soundproof sheet, noise barrier tarp
Hang soundproof sheets to minimize construction noise affecting neighbors.
コンテナ こんてな waste skip container, debris bin
Place sorted scrap iron into the site waste container.
片付け かたづけ tidying up, packing away tools and cleanup
Tidy up tools and leftover materials on site after finishing work.
引き渡し ひきわたし project handover, building turnover to client
Turn over the building to the owner after completing final cleaning.

Unit 6: Safety Management, KY Activities, Heatstroke Prevention, and Emergency Response

Morning safety meetings, KY hazard prediction, heatstroke countermeasures, and accident first aid.

Morning Safety Briefings, KY Hazard Prediction, and Site Discipline

Vocabulary for: Morning Safety Briefings, KY Hazard Prediction, and Site Discipline
Vocabulary (Kanji / Kana) Reading Meaning & Notes
朝礼 ちょうれい morning briefing, morning assembly (chourei)
Everyone participates in the morning briefing every morning to hear work announcements.
ラジオ体操 らじおたいそう radio calisthenics, morning warmup exercises
Perform radio calisthenics before work to prevent injuries.
指差呼称 しさこしょう pointing and calling, check-and-call confirmation (yubisashi koushou)
Perform pointing and calling aloud, confirming 'Safety OK!'
KY活動 けーわいかつどう hazard prediction activities (KY activities)

Abbreviation for 危険予知活動 (Kiken Yochi / Hazard Prediction Activities).

Gather by work crew to conduct KY hazard prediction activities.
危険予知 きけんよち hazard prediction, identifying hidden risks
Predict potential hazards lurking in the work and determine countermeasures.
安全パトロール あんぜんぱとろーる safety patrol, site safety inspection walk
The site manager conducts a safety patrol of the construction site.
元請け もとうけ general contractor, prime contractor (motouke)
Follow instructions from the general contractor to enforce strict safety management.
下請け したうけ subcontractor (shitauke)
The person in charge of the subcontractor attends the morning coordination meeting.
立入禁止 たちいりきんし Keep Out, off-limits, restricted area
Place Keep Out safety cones around floor openings.
開口部 かいこうぶ floor opening, penetrations and open hatchways
Cover floor openings with secure lids and fasten them firmly.

Working Environment and Heatstroke Prevention

Vocabulary for: Working Environment and Heatstroke Prevention
Vocabulary (Kanji / Kana) Reading Meaning & Notes
熱中症 ねっちゅうしょう heatstroke, heat exhaustion
Pay close attention to heatstroke when working outdoors in the summer.
水分補給 すいぶんほきゅう hydration, frequent water intake
Hydrate frequently before you feel thirsty.
塩分補給 えんぶんほきゅう salt replenishment, electrolyte intake
Consume salt-replenishing tablets when sweating heavily.
WBGT だぶりゅーびーじーてぃー WBGT index, wet-bulb globe temperature heat index

Wet Bulb Globe Temperature heat index (暑さ指数) used to assess heatstroke risk.

Take a rest break when the WBGT value rises high.
休憩所 きゅうけいじょ air-conditioned rest area, break shelter
Cool down your body in an air-conditioned rest shelter.
送風機 そうふうき blower fan, portable air ventilator
Supply fresh air to underground workspaces using a blower fan.
酸欠 さんけつ oxygen deficiency, anoxia

Under statutory oxygen deficiency prevention rules, an oxygen concentration below 18% is legally defined as an oxygen-deficient hazard.

Measure oxygen levels in the manhole due to the risk of oxygen deficiency.
換気 かんき ventilation, air circulation
Open windows to ventilate when using paints.
仮設トイレ かせつといれ temporary site toilet, portable chemical restroom
Use the temporary toilets cleanly to maintain sanitary conditions.
喫煙所 きつえんじょ designated smoking area
Smoking outside designated smoking areas is prohibited to prevent fire.

Emergency Response, First Aid, and Accident Reporting

Vocabulary for: Emergency Response, First Aid, and Accident Reporting
Vocabulary (Kanji / Kana) Reading Meaning & Notes
ヒヤリハット ひやりはっと near-miss incident (hiyari-hatto)
Report near-miss cases to prevent recurring incidents.
非常ベル ひじょうべる emergency alarm bell, fire alarm button
Press the emergency alarm bell to alert others if you discover a fire.
消火器 しょうかき portable fire extinguisher
Confirm the location of fire extinguishers for initial firefighting response.
避難経路 ひなんけいろ evacuation route, emergency escape path
Organize the area so that objects do not block the evacuation route.
担架 たんか rescue stretcher, litter
Place the injured worker on a stretcher and transport them to the first aid room.
AED えーいーでぃー automated external defibrillator (AED)
Use an AED on a person in cardiopulmonary arrest to save their life.
止血 しけつ bleeding control, hemostasis
Apply direct firm pressure on the wound with clean gauze to stop bleeding.
労災 ろうさい occupational accident, workers' compensation injury (rousai)

Abbreviation for 労働災害 (industrial accident / occupational hazard).

Comply with safety rules aiming for zero occupational accidents.
緊急連絡網 きんきゅうれんらくもう emergency contact network, emergency call tree
Make telephone calls according to the emergency contact tree if an accident occurs.
第一報 だいいっぽう initial report, first incident alert (daiippou)
Immediately submit an initial report to the general contractor if someone is injured.

Source

Authored by GoMe

Based on the Tokutei Ginou exam framework; does not claim affiliation with or endorsement by exam administrators.