Mechanical & Manufacturing Japanese
Workplace Dialogues: Mechanical & Manufacturing Japanese
Explore 15 real workplace Japanese conversation dialogues in Mechanical & Manufacturing Japanese. Practice Japanese workplace communication with GoMe Nihongo.
Bugs & Incidents
-
Reporting Customer Defect to Manager
顧客からの不良連絡を上司に報告するA customer just reported that burrs were found on brackets delivered yesterday. You report to your Section Manager (Kacho): the symptoms, quantity, interim containment actions in progress, and the response schedule.
13 lines -
Reporting Defective Dimension to Team Leader and Isolating Suspect Lot
班長にNGを報告して、一緒に切り分けるDuring in-process inspection, you discover that a bore diameter exceeds the upper tolerance limit. You report to your Team Leader, and together you isolate the suspect parts: determining when the issue began, ruling out tool wear and offsets, evaluating thermal shopfloor effects, and quarantine tagging.
13 lines -
Receiving Customer Quality Claim and Committing Corrective Action Report
クレームを受けて、対策書の提出を約束するA customer quality assurance representative calls: incorrect parts were mixed into last week's delivery. You apologize sincerely, gather specific facts, state immediate containment actions (lot recall, immediate replacement delivery, sorting stock), and commit to submitting a formal 8D corrective action report.
14 lines -
Reporting Forklift Near-Miss Incident to Manager
フォークリフトのヒヤリハットを報告するAt the corner of the shipping area, you nearly collided with a forklift backing out from behind shelving. No one was injured, but you immediately report to your Section Manager: the sequence of events, hazards, committing to submit a report within the day, and proposed countermeasures.
12 lines
Specs & Requirements
-
Calling Client to Clarify Technical Drawings
図面の内容をお客様に確認するThe client drawing specifies a tight tolerance that is difficult to sustain with current equipment and omits whether dimensions apply before or after plating. Calling to confirm before machining.
12 lines -
Clarifying Drawing Tolerances with Design Engineer
図面の公差について設計に確認するA new shaft drawing specifies an h6 tolerance across the entire length, whereas only the bearing journal appears to require precision fitting. As a manufacturing engineer, you consult the in-house design engineer to explore relaxing the tolerance on non-critical sections to reduce grinding cycle time.
12 lines -
Requesting Quotation and Lead Time from Subcontractor
外注先に見積もりと納期回答を依頼するInternal grinding machines are fully booked, so 200 shaft components must be outsourced for OD grinding. You call a trusted subcontractor to request a quotation and delivery commitment, explaining conditions: free-issue material provided after heat treatment, with inspection certificates required upon delivery.
12 lines -
Instructing Trainee on Proper Torque Wrench Usage
実習生にトルクレンチの使い方を教えるAdi is a newly assigned Indonesian technical intern on the assembly line. You instruct him on using a torque wrench per the standard work procedure: setting torque value, stopping at the click, applying match marks, proper storage, and common rookie pitfalls.
15 lines
Meetings & Reporting
-
Reporting New Line Status at Production Meeting
生産会議で新ラインの状況を報告するMorning production meeting. As the manufacturing engineer in charge of the new line, you report actual production volume against the plan, causes of delay, countermeasures, and request weekend overtime support.
12 lines -
Reporting Pre-Shift Inspection Anomaly at Morning Assembly
朝礼で始業点検の異常を報告するMorning assembly (Chourei) at the machining shop. During the pre-shift inspection, you noticed an abnormal sound from Machine 3's main spindle. You report to your Team Leader: symptoms, vibration measurement, request maintenance check, and alternative machining plan.
10 lines -
Reporting Progress to Client in Regular Meeting
定例会議でお客様に進捗を報告するWeekly regular progress meeting with client regarding a new component transitioning to mass production. You report: mass-production pilot machining completed on schedule, initial sample measurement status (29 of 30 dimensions pass), suspected cause of position error, and remeasurement timeline.
13 lines -
Handing Over Equipment Trouble to Night Shift
夜勤に設備トラブルを引き継ぐEnd of day shift. Press machine 2 had stopped due to a hydraulic low-pressure alarm and was recently restored. As manufacturing engineer, you hand over to the night shift Team Leader: what occurred, recovery action, monitoring parameters, and when to halt and call.
13 lines
Review & QA
-
Conducting Client Witness Inspection Before Equipment Shipment
お客様の立会検査に対応するA client visits the shop to conduct a witness inspection prior to equipment shipment. You demonstrate continuous trial runs, report cycle time against specifications, and demonstrate emergency stop functions. The client notes a gap in the safety door; both parties agree on a modification and verification plan.
13 lines -
Presenting Kaizen Proposal to Section Manager
課長に改善提案を説明するOn the assembly line last month, missing washers occurred 3 times. You present a poka-yoke proposal using sensors to your Section Manager: problem statement, technical solution, cost, quantified benefits, and horizontal deployment potential.
12 lines -
Reviewing Slow Die Changeover with Team Leader
時間がかかった段取り替えを班長と振り返るThis morning's press die changeover took 75 minutes, causing the line to fall behind schedule. At the end of the shift, you and your Team Leader review a video recording step-by-step to identify time waste and tasks that can be converted to external setup (external changeover).
12 lines