Mechanical & Manufacturing Japanese · 夜勤に設備トラブルを引き継ぐ

Handing Over Equipment Trouble to Night Shift

End of day shift. Press machine 2 had stopped due to a hydraulic low-pressure alarm and was recently restored. As manufacturing engineer, you hand over to the night shift Team Leader: what occurred, recovery action, monitoring parameters, and when to halt and call.

Me

Yamamoto-san, do you have a moment for shift handover? It is regarding Press Machine 2.

Other (H)

Ah, the machine that was stopped earlier this evening?

Me

Yes. Around 4 o'clock, it tripped on a low hydraulic pressure alarm.

Other (H)

What was the cause?

Me

The hydraulic unit filter was clogged. We replaced the filter and restored operation at 5:30.

Other (H)

So it is running normally now?

Me

Yes. However, the pressure remains slightly unstable, so could you please check the pressure gauge once an hour and log it in the daily report?

Other (H)

Sure thing. At what threshold should we shut it down?

Me

If the needle drops below the red line, please stop the machine immediately. At that time, please call my mobile phone even in the middle of the night.

Other (H)

Understood. Do we have spare filters?

Me

Yes, there are two spare filters on the spare parts shelf. The replacement procedure is posted right beside the equipment.

Other (H)

OK. If anything happens, I will pass it on during the morning handover.

Me

Thank you very much. I will also come over to check the machine tomorrow morning.

Key Patterns

  • Casual shopfloor opening phrase to request shift handover time
  • Reporting that equipment halted due to a specific alarm or error code
  • Politely asking a colleague to perform a monitoring or supportive task
  • Establishing a definitive numerical or visual threshold for machine shutdown