Construction Japanese · 是正報告書
Corrective Action Report for Identified Defect
Japanese Text
Copied!
是正報告書
〔〇年〇月〇日〕
〔〇〇設計事務所〕
〔〇〇〕様
〔会社名〕
〔工事名〕作業所 〔名前〕
〔〇月〇日〕の〔監理者検査〕でご指摘いただいた事項について、下記のとおり是正いたしましたので、ご報告いたします。
記
■指摘No.〔1〕
指摘箇所:〔例:3階 X3-Y2通り 柱〕
指摘内容:〔例:柱脚の打ち継ぎ部に浅いジャンカがある。〕
原因:〔例:打設時に、柱脚部の締め固めが不足していた。〕
是正内容:〔例:不良部分をはつり取り、ポリマーセメントモルタルで補修した。〕
是正日:〔〇月〇日〕
■再発防止策
〔例:打設時はバイブレーターの担当者を柱ごとに決め、柱脚部を重点的に締め固める。脱型後、全数を目視で確認する。〕
■添付資料
是正前・是正後の写真(〔〇〕枚)
以上
Structure Breakdown
〔〇月〇日〕の〔監理者検査〕でご指摘いただいた事項について
Open by specifying which inspection and on what date. The humble phrase ご指摘いただいた ("which you kindly pointed out") frames the identification of a defect as assistance rather than fault-finding.
記
The character 記 opens the itemized details and 以上 closes them—the classic Japanese formal document format. The preamble before 記 uses honorifics, while the section after 記 lists factual items in concise plain form or noun phrases.
■指摘No.〔1〕
Use the exact item number assigned in the supervisor inspection punch list. Presenting each item in its own block allows inspectors to sign off on resolved items one by one.
原因:〔例:打設時に、柱脚部の締め固めが不足していた。〕
State the objective technical root cause rather than writing "due to carelessness". Supervisors need to know whether the defect could recur across other columns.
是正内容:〔例:不良部分をはつり取り、ポリマーセメントモルタルで補修した。〕
Specify how the defect was repaired and what materials were used. Chipping away defective concrete and patching with polymer cement mortar applies to shallow surface honeycombs. Deep voids reaching rebar or affecting structural integrity require prior consultation with the supervisor before repair.
■再発防止策
Measures to prevent recurrence—the section supervisors scrutinize most closely. Must be concrete: who does what, when, and how it is verified.
是正前・是正後の写真(〔〇〕枚)
Photos before and after repair taken from identical angles, showing the site blackboard with the location marked. Without photographic proof, supervisors cannot formally confirm remediation.
English Translation
Corrective Action Report
[Year/Month/Day]
[Design Office Co., Ltd.]
Dear [Architect/Supervisor Name]
[Company Name]
[Project Name] Site Office, [Your Name]
Regarding the items pointed out during the [Supervisor Inspection] on [Month/Day], we have completed corrective actions as detailed below and submit our report.
Details
■ Pointed-Out Item No. [1]
Location: [Example: 3rd floor column along Grid Line X3-Y2]
Identified Defect: [Example: Shallow honeycomb at the cold joint at column base.]
Cause: [Example: Insufficient internal vibration and compaction at the column base during concrete placement.]
Corrective Action: [Example: Chipped away defective concrete until sound concrete was reached, and repaired with polymer cement mortar.]
Date of Correction: [Month/Day]
■ Recurrence Prevention Measures
[Example: During future placements, assign dedicated vibrator operators per column to thoroughly compact column bases. After formwork stripping, perform 100% visual inspection of all columns.]
■ Attached Documents
Photographs before and after corrective action ([Number] photos)
End of Report
Writing Tips & Notes
Take "before repair" photographs immediately when a defect is pointed out, before workers touch it—once repaired, the original state can never be photographed again.