Construction Japanese · ヒヤリハット報告書
Near-Miss Incident Report
Japanese Text
Copied!
ヒヤリハット報告書
報告日:〔〇月〇日〕
報告者:〔名前〕(〔会社名〕・〔職種〕)
■いつ
〔〇月〇日〕〔午前10時〕頃
■どこで
〔例:4階 東側 外部足場〕
■何をしていたとき
〔例:型枠材を肩に担いで、足場の上を運んでいたとき〕
■何が起きたか
〔例:足場の通路に置いてあった番線に足を取られ、転びそうになった。手すりにつかまったので、けがはなかった。〕
■分類
〔例:転倒(つまずき)〕
■原因と思われること
〔例:前日に使った番線が片付けられず、通路に残っていた。材料を担いでいて、足元が見えなかった。〕
■対策(案)
〔例:作業終了時に、足場の通路に物が残っていないか職長が確認する。長い材料は二人で運ぶ。〕
■確認
職長:〔名前〕 元請担当:〔名前〕
Structure Breakdown
報告者:〔名前〕(〔会社名〕・〔職種〕)
Record the company and trade to identify which crews encounter specific hazards and deliver targeted guidance. Naming the reporter facilitates follow-up questions rather than assigning fault.
■何をしていたとき
Detail the precise work activity underway. Countermeasures differ greatly between carrying heavy materials versus walking unencumbered when a trip occurs.
■何が起きたか
Describe objectively what occurred and why it stopped short of injury. The grammatical pattern ~そうになった ("almost happened") is quintessential to near-miss reports. Internal logs use plain form (~た) rather than formal honorifics.
■分類
Classify the event using official Ministry of Health, Labour and Welfare injury accident type categories: falls from height, trips on same level, impacts, flying/falling objects, caught in/between. Standard classification enables statistical analysis of recurrent hazards.
■原因と思われること
Identify hazardous site conditions (unorganized materials, poor lighting, obstructed sightlines) rather than stopping at personal carelessness.
■対策(案)
Formulate actionable proposals specifying who acts and when. Designated as proposed (案) because official measures are finalized with site foremen and management, then shared in morning assemblies or KY meetings.
■確認
Signed confirmation by both trade foreman and general contractor supervisor confirms review. Unread reports discourage field personnel from reporting future hazards.
English Translation
Near-Miss Incident Report
Report Date: [Month/Day]
Reporter: [Reporter Name] ([Company Name], [Trade/Craft])
■ When
Around [10:00 AM] on [Month/Day]
■ Where
[Example: 4th floor exterior scaffolding, east side]
■ Activity at the Time
[Example: Carrying formwork lumber on shoulder along the scaffold walkway]
■ What Happened
[Example: Foot caught on binding wire left in the scaffold walkway, almost tripped and fell. Caught hold of the handrail, so no injury occurred.]
■ Incident Classification
[Example: Fall on same level (tripping)]
■ Probable Root Cause
[Example: Binding wire used the previous day was not cleared and remained in walkway. Carrying lumber obstructed forward view of footing.]
■ Proposed Countermeasures
[Example: Foreman inspects scaffold walkways at end of shift to confirm no objects remain. Two workers carry long materials together.]
■ Verification
Foreman: [Foreman Name] General Contractor In-Charge: [In-Charge Name]
Writing Tips & Notes
Complete the report on the same day with maximum detail: exact location, object involved, and height. Filing a near-miss report is not about assigning blame—it enables site-wide correction before someone suffers a real injury.