Construction Japanese · Cost Estimation & Budgeting
What does 見積書 mean in Japanese?
Quotation, written estimate, bid document
| Terms | 見積書 |
|---|---|
| Reading | みつもりしょ |
| English Meaning | Quotation, written estimate, bid document |
| Level | Core |
| Specialty Area | Cost Estimation & Budgeting |
| Specialty | Construction Japanese |
Technical Explanation
A formal commercial quotation document whose cover sheet states the project title, total lump-sum bid price, validity period, and commercial terms, backed by an itemized breakdown (uchiwakesho). Submitting a quotation represents a legally binding price commitment, requiring diligent pre-submission audits of measured quantities, inclusions, and exclusions.
Practical Notes
Under Construction Business Act revisions effective December 2025, contractors are required to itemize material costs, labor costs by trade, and statutory expenditures alongside required work durations in quotations, with statutory prohibitions against predatory under-pricing.
Workplace Examples
見積書の有効期限は、提出から3か月です。
The validity period of the quotation is 3 months from submission.
協力会社から届いた見積書を、内訳まで確認してください。
Please verify the quotation received from the subcontractor down to its itemized breakdown.