What does 見積条件 mean in Japanese?
Quotation conditions, bid assumptions and exclusions
| Terms | 見積条件 |
|---|---|
| Reading | みつもりじょうけん |
| English Meaning | Quotation conditions, bid assumptions and exclusions |
| Level | Core |
| Specialty Area | Cost Estimation & Budgeting |
| Specialty | Construction Japanese |
Technical Explanation
The contractual qualifications and scope boundaries governing a price estimate: trade work scope inclusions and exclusions, responsibility for site utilities, temporary scaffolding provision, crane lifting support, waste disposal, and working hours (daytime versus night shifts). Because identical total prices represent radically different scopes under different assumptions, reviewing conditions must precede price evaluation.
Practical Notes
Key qualification terminology: betto (別途 = excluded / billed separately), shikyū (支給 = client/contractor-supplied materials), fukumu (含む = fully included). Line items designated betto are prime candidates for future variation claims.
Workplace Examples
見積条件に、足場は別途と書いてあります。
In the quotation conditions, it is stated that scaffolding is separate.
見積条件が違うので、この二つの見積もりは単純に比べられません。
Because the quotation conditions differ, these two quotations cannot be simply compared.