Construction Japanese · Structural & Core Works
What does 建入れ直し mean in Japanese?
Plumb alignment correction (structural steel framing)
| Terms | 建入れ直し |
|---|---|
| Reading | たていれなおし |
| English Meaning | Plumb alignment correction (structural steel framing) |
| Level | Advanced |
| Specialty Area | Structural & Core Works |
| Specialty | Construction Japanese |
Technical Explanation
The critical adjustment process following steel frame erection where column verticality and plumbness are surveyed and corrected using wire ropes, come-alongs, or turnbuckles before final bolt torquing. As a strict rule, plumb correction must be certified complete prior to final tightening (本締め), as bolts cannot be readjusted once fully tensioned.
Practical Notes
Measured using plumb bobs (下げ振り), total stations, or precision laser plummets; allowable tolerances follow architectural steel specifications (JASS 6).
Workplace Examples
建入れ直しが終わるまで、本締めはしないでください。
Do not perform final bolt tightening until plumb alignment correction is completed.