Construction Japanese · Structural & Core Works
What does 存置期間 mean in Japanese?
Formwork retention period
| Terms | 存置期間 |
|---|---|
| Reading | そんちきかん |
| English Meaning | Formwork retention period |
| Level | Advanced |
| Specialty Area | Structural & Core Works |
| Specialty | Construction Japanese |
Technical Explanation
The mandatory time interval during which formwork panels and shoring props must remain in place after concrete casting before stripping is permissible. It is specified either by calendar days based on daily mean curing temperatures and cement type, or by achieving compressive strength test thresholds.
Practical Notes
Retention periods differ between vertical side forms (columns, walls) and horizontal bottom load-bearing forms (slabs, beams). In cold winter weather, retention times must be significantly extended.
Workplace Examples
特記仕様書で、型枠の存置期間を確認してください。
Please check the formwork retention period in the special specifications.
存置期間より前に外すときは、テストピースで強度を確認します。
When stripping before the retention period, verify strength using test pieces.