Construction Japanese · Structural & Core Works

What does 存置期間(そんちきかん) mean in Japanese?

Formwork retention period

Terms: 存置期間
Terms存置期間
Readingそんちきかん
English MeaningFormwork retention period
LevelAdvanced
Specialty AreaStructural & Core Works
SpecialtyConstruction Japanese

Technical Explanation

The mandatory time interval during which formwork panels and shoring props must remain in place after concrete casting before stripping is permissible. It is specified either by calendar days based on daily mean curing temperatures and cement type, or by achieving compressive strength test thresholds.

Practical Notes

Retention periods differ between vertical side forms (columns, walls) and horizontal bottom load-bearing forms (slabs, beams). In cold winter weather, retention times must be significantly extended.

Workplace Examples

Please check the formwork retention period in the special specifications.

When stripping before the retention period, verify strength using test pieces.

Related Terms

Source

Authored by GoMe