Construction Japanese · 設備取り合い打合せ記録
Coordination Meeting Minutes with MEP Subcontractors
Japanese Text
Copied!
打合せ記録(〔3階 天井内〕の設備取り合い)
日時:〔〇月〇日(〇)〇時~〇時〕
場所:〔現場事務所〕
出席者(敬称略):
建築 〔会社名〕〔名前〕
空調 〔〇〇設備〕〔名前〕
電気 〔〇〇電気〕〔名前〕
衛生 〔〇〇工業〕〔名前〕
使用図面:〔総合図 第〇版(〇月〇日)〕
■協議内容
No.1 〔例:3階 廊下 X2~X3間 ダクトと梁の干渉〕
→〔例:扁平ダクトに変更し、梁下を通す。(空調)〕
No.2 〔例:3階 事務室 照明と吹き出し口の位置が重なる〕
→〔例:吹き出し口を東へ300mm移動する。(空調・電気)〕
No.3 〔例:天井点検口の位置〕
→継続検討。〔例:各社で必要な位置を総合図に記入し、次回持ち寄る。〕
■各社への依頼
・〔例:空調:ダクト施工図を修正し、〇月〇日までに提出〕
・〔例:建築:総合図を改訂し、〇月〇日に配布〕
■次回
〔〇月〇日(〇)〇時~〕 〔現場事務所〕
以上
Structure Breakdown
打合せ記録(〔3階 天井内〕の設備取り合い)
The title specifies the exact physical zone. MEP coordination sessions are typically divided by floor or zone (ceiling plenum, vertical shaft, plant room), with each zone tracked in a separate record.
出席者(敬称略):
List attendees by engineering discipline (Architecture, HVAC, Electrical, Plumbing) before listing company and names: readers immediately identify which trades were represented and which absent trades must receive minutes.
使用図面:〔総合図 第〇版(〇月〇日)〕
Record the exact drawing number and revision date used in the meeting. All agreements are tethered to that revision; subsequent drawing revisions must be checked against this record.
■協議内容
For each point: the first line states location (floor, grid line) and clash; the arrow line records the agreed resolution and the responsible trade in parentheses. Vague references like "in the corridor" prevent field teams from identifying clash points.
継続検討。
The term 継続検討 signifies "ongoing review": unresolved clash points must still be documented along with action items for the subsequent session to prevent items from being forgotten.
■各社への依頼
Action items assigned to each trade with firm deadlines. Decisions documented on paper have no field impact until each trade incorporates them into their respective shop drawings.
English Translation
Coordination Meeting Record (MEP Interface within [3rd Floor Ceiling Plenum])
Date & Time: [Month/Day (Day of Week), 0:00 to 0:00]
Location: [Site Office]
Attendees (honorifics omitted):
Architecture: [Company Name], [Architect Name]
HVAC: [HVAC Equipment Co., Ltd.], [HVAC Rep Name]
Electrical: [Electrical Works Co., Ltd.], [Electrical Rep Name]
Plumbing/Sanitary: [Plumbing Industries Co., Ltd.], [Plumbing Rep Name]
Drawings Used: [Composite Coordination Drawing, Revision Number, (Month/Day)]
■ Items Discussed
No. 1 [Example: 3rd floor corridor between Grid Lines X2 and X3, physical clash between duct and beam]
-> [Example: Change to flat oval duct to route beneath the beam. (HVAC)]
No. 2 [Example: 3rd floor office, clash between lighting fixture and air supply diffuser locations]
-> [Example: Shift air diffuser 300 mm to the east. (HVAC & Electrical)]
No. 3 [Example: Locations of ceiling inspection hatches]
-> Ongoing review. [Example: Each trade marks required hatch positions on the composite drawing and brings to next meeting.]
■ Action Requests to Each Trade
・[Example: HVAC: Revise duct shop drawings and submit by Month/Day]
・[Example: Architecture: Update composite coordination drawing and distribute by Month/Day]
■ Next Meeting
[Month/Day (Day of Week), from 0:00] at [Site Office]
End of Minutes
Writing Tips & Notes
Bring large-format printed composite drawings (総合図) to the meeting, mark up notes directly onto them, and photograph them to attach to the minutes. If a subcontractor trade is absent, send them the minutes immediately on the same day—any interface resolved without all affected parties present will inevitably have to be reopened.