Daily Site Construction Report
Japanese Text
Copied!
作業日報
日付:〔〇月〇日〕 天候:〔晴れ〕
工事名:〔〇〇ビル新築工事〕
会社名:〔会社名〕 作成者:〔名前〕
■本日の作業内容
・〔例:2階 床型枠の組立〕
・〔例:2階 梁の配筋〕
■作業人員
〔職種〕〔人数〕名 合計〔人数〕名
■搬入資材・使用機械
〔例:鉄筋 D13 3t、クレーン1台〕
■安全・ヒヤリハット
〔例:開口部の手すりが一部外れていたため、作業前に元に戻した。〕
■明日の予定
〔例:2階 床の配筋検査、スリーブの取付〕
■連絡事項
〔例:明日10時に鉄筋の搬入があります。〕
以上
Structure Breakdown
日付:〔〇月〇日〕 天候:〔晴れ〕
Document weather conditions: heavy rain and high winds constitute valid justifications for site stand-downs and serve as objective legal evidence for schedule delay claims.
■本日の作業内容
Log activities by exact spatial location (floor, structural grid axis) and trade category so supervisors can cross-reference against the project master schedule.
■作業人員
Record personnel counts by trade specialty. These figures govern site safety roll calls (who is present on site) and subcontractor accounting, demanding strict factual accuracy.
■安全・ヒヤリハット
Log near-miss incidents (hiyari-hatto) alongside corrective actions taken. Leaving this section perpetually blank signals inattention rather than true site safety.
■明日の予定
Outline tomorrow scheduled tasks and incoming material deliveries so the general contractor can coordinate tower cranes, vehicular access, and inspection milestones.
■連絡事項
Highlight matters the general contractor must know or decide: delivery windows, technical blueprint ambiguities, or material delivery bottlenecks.
以上
"以上" (Above / End of Report) — the universal formulaic mark concluding formal Japanese operational logs and reports.
English Translation
Daily Construction Report
Date: [Month/Day] Weather: [Clear]
Project Name: [New Construction of Building XX]
Company: [Subcontractor Name] Reporter: [Your Name]
■ Today Operations
・[Example: 2nd Floor, Formwork Assembly]
・[Example: 2nd Floor, Beam Rebar Placement]
■ Site Workforce
[Trade] [Number] workers Total [Total Number] workers
■ Delivered Materials & Utilized Machinery
[Example: Rebar D13 3 tons, 1 mobile crane]
■ Safety & Near-Miss Incidents
[Example: Edge handrail partially loosened; secured prior to commencing work.]
■ Tomorrow Plan
[Example: 2nd Floor slab rebar inspection, sleeve conduit placement]
■ Coordination Items
[Example: Steel delivery vehicle arriving tomorrow at 10:00 AM.]
End of Report
Writing Tips & Notes
Complete the log daily before leaving while headcount and volume are fresh in mind. Attach photos of areas about to be enclosed permanently.