Daily Site Construction Report

Japanese Text

作業日報

日付:〔〇月〇日〕 天候:〔晴れ〕
工事名:〔〇〇ビル新築工事〕
会社名:〔会社名〕 作成者:〔名前〕

■本日の作業内容
・〔例:2階 床型枠の組立〕
・〔例:2階 梁の配筋〕

■作業人員
〔職種〕〔人数〕名 合計〔人数〕名

■搬入資材・使用機械
〔例:鉄筋 D13 3t、クレーン1台〕

■安全・ヒヤリハット
〔例:開口部の手すりが一部外れていたため、作業前に元に戻した。〕

■明日の予定
〔例:2階 床の配筋検査、スリーブの取付〕

■連絡事項
〔例:明日10時に鉄筋の搬入があります。〕

以上

Structure Breakdown

Document weather conditions: heavy rain and high winds constitute valid justifications for site stand-downs and serve as objective legal evidence for schedule delay claims.
Log activities by exact spatial location (floor, structural grid axis) and trade category so supervisors can cross-reference against the project master schedule.
Record personnel counts by trade specialty. These figures govern site safety roll calls (who is present on site) and subcontractor accounting, demanding strict factual accuracy.
Log near-miss incidents (hiyari-hatto) alongside corrective actions taken. Leaving this section perpetually blank signals inattention rather than true site safety.
Outline tomorrow scheduled tasks and incoming material deliveries so the general contractor can coordinate tower cranes, vehicular access, and inspection milestones.
Highlight matters the general contractor must know or decide: delivery windows, technical blueprint ambiguities, or material delivery bottlenecks.
"以上" (Above / End of Report) — the universal formulaic mark concluding formal Japanese operational logs and reports.

English Translation

Daily Construction Report Date: [Month/Day] Weather: [Clear] Project Name: [New Construction of Building XX] Company: [Subcontractor Name] Reporter: [Your Name] ■ Today Operations ・[Example: 2nd Floor, Formwork Assembly] ・[Example: 2nd Floor, Beam Rebar Placement] ■ Site Workforce [Trade] [Number] workers Total [Total Number] workers ■ Delivered Materials & Utilized Machinery [Example: Rebar D13 3 tons, 1 mobile crane] ■ Safety & Near-Miss Incidents [Example: Edge handrail partially loosened; secured prior to commencing work.] ■ Tomorrow Plan [Example: 2nd Floor slab rebar inspection, sleeve conduit placement] ■ Coordination Items [Example: Steel delivery vehicle arriving tomorrow at 10:00 AM.] End of Report

Writing Tips & Notes

Complete the log daily before leaving while headcount and volume are fresh in mind. Attach photos of areas about to be enclosed permanently.