What does 精算幅 mean in Japanese?
Billable-hours range (SES payment threshold)
| Terms | 精算幅 |
|---|---|
| Reading | せいさんはば |
| English Meaning | Billable-hours range (SES payment threshold) |
| Level | Advanced |
| Specialty Area | Project Management |
| Specialty | IT Japanese |
Technical Explanation
In SES contracts, the monthly working hours bracket covered by a fixed base fee (for example, 140 to 180 hours). As long as monthly hours fall within this range, the billing fee remains fixed; hours exceeding the upper threshold incur additional contract billing, while hours falling below the lower threshold result in a deduction. Consequently, SES engineers must track and record their working hours accurately.
Practical Notes
The specific hour figures and formulas for calculating additional contract billing above the range or deductions below it depend on the individual contract. Inquire with your company to confirm your designated range—it directly impacts decisions regarding whether overtime work is appropriate.
Workplace Examples
この案件の精算幅は、140~180時間です。
The billable-hours range (精算幅) for this project is 140 to 180 hours.
今月は休みが多かったので、精算幅を下回らないか確認します。
Because there were many holidays this month, I will verify whether my hours fall below the billable-hours range.