Mechanical & Manufacturing Japanese · 改善提案書

Kaizen Proposal Sheet

Japanese Text

改善提案書

提出日:〔〇年〇月〇日〕
提案者:〔所属〕 〔名前〕
対象工程:〔ライン名〕〔工程名〕

■テーマ
〔例:段取り替え時間の短縮〕

■現状と問題点
〔例:品番を切り替えるたびに治具を交換しており、段取り替えに平均40分かかっている。〕
〔例:その間は設備が止まるため、停止時間が1日あたり約80分になっている。〕

■改善案
〔例:治具の位置決めをピン方式に変え、交換後の芯出しを不要にする。〕
〔例:次の品番の治具と工具を、設備が動いている間に準備する(外段取り化)。〕

■期待効果
〔例:段取り替え時間 40分→20分(50%削減)〕
〔例:設備の停止時間 1日あたり約40分の削減〕
〔例:効果金額 年間約〇万円〕

■必要な費用
〔例:位置決めピンと治具の改造費 約〇万円〕

■実施計画
〔例:〇月 治具改造、〇月 試行、〇月 標準化(作業手順書の改訂)〕

■備考
〔例:同じ治具を使う2号機にも展開できる。〕

Structure Breakdown

A concise one-line theme (■テーマ) stating what is improved using action nouns: ~の短縮 (shortening), ~の削減 (reduction), or ~の防止 (prevention), immediately categorizing the proposal.
Describes the current state (■現状と問題点) using concrete shopfloor measurements: cycle times, scrap counts, or frequencies, replacing subjective claims like 'takes too long'.
Proposes specific engineering or operational changes (■改善案), ideally supplemented by simple sketches (ポンチ絵) or photos for swift management evaluation.
Quantifies expected improvements (■期待効果) by comparing before versus after metrics, translating operational time savings into financial benefits (効果金額).
Explicitly balances required implementation costs (■必要な費用) against projected financial benefits so leadership can evaluate payback periods immediately.
Outlines phased implementation milestones (■実施計画), culminating in procedural standardization (標準化) to permanently prevent processes from reverting to legacy habits.

English Translation

Kaizen Proposal Sheet Submission Date: [Year/Month/Day] Proposer: [Department] [Name] Target Process: [Line Name] - [Process Name] ■ Improvement Theme Example: Reduction of changeover cycle time ■ Current Situation and Problem Statement Example: Fixtures must be replaced at every part changeover, requiring an average setup time of 40 minutes. Example: Equipment remains stopped during this duration, generating approximately 80 minutes of total downtime per day. ■ Improvement Proposal Example: Convert fixture locating to pin-based positioning, eliminating centering after replacement. Example: Prepare fixtures and tooling for the subsequent part number while the machine is running (external setup conversion). ■ Expected Benefits Example: Changeover cycle time reduced from 40 minutes to 20 minutes (50% reduction) Example: Equipment downtime reduced by approximately 40 minutes per day Example: Annual cost savings: approx. ¥[Amount] × 10,000 per year ■ Required Costs Example: Locating pins and fixture modification costs: approx. ¥[Amount] × 10,000 ■ Implementation Schedule Example: [Month] Fixture modification, [Month] Trial run, [Month] Standardization (Revision of standard work procedure sheets) ■ Remarks Example: This countermeasure can be horizontally deployed to Machine No. 2, which utilizes identical fixture tooling.

Writing Tips & Notes

Submit even modest improvements: Japanese factories promote active Kaizen suggestion programs (改善提案制度), often with quarterly participation targets. Keep descriptions concise (1-3 lines per section) and quantify before/after metrics.

Source

Authored by GoMe